Client reported:
All three diesel generators and emergency generator in-operational
Vessel on battery power, emergency lights and communication working
No domestic water for toilet or bathing facilities
No Galley power so no cooked food
No air-conditioning or fans
Reefer chambers off-line. Stored raw foodstuff spoiling.
Rental shore generators could be placed on board only after ship's power was restored and mid-ship cranes made operational.
Zara Maritime experts boarded to troubleshoot the cause, identify and rectify the problems.
Additional manpower resources boarded to assist ship's staff to carry out physical repairs required to rectify the identified problems.
Power restored in record time.
Additional technical problems identified by Zara Maritime's specialists and those reported by the ship's staff and ship's managers, resolved to client's satisfaction.
Job closed out upon satisfactory survey and certification by ship's Classification Society.